Wind Development Director Interview Questions

For managers who lead wind farm projects in development or construction. Interviews focus on site assessments, project planning, and oversight of subcontractors.

20 questions, ranked by what the job needs most

Print the top 10:Scoring sheetPractice sheet

  1. Question 1: Walk me through how you keep development, wind resource, engineering and construction teams working toward the same project goals.

  2. Question 2: Tell me how you kept a wind farm project within budget when construction costs started to rise.

  3. Question 3: Tell me about a negotiation you led or supported on a wind project, such as a land lease, power purchase agreement or interconnection agreement.

  4. Question 4: Walk me through how you built the plan for a wind energy project, from scope and schedule to costs and contingencies.

  5. Question 5: Walk me through how you handled a subcontractor or consultant whose work on a wind project fell short on quality, specifications or budget.

  6. Question 6: Tell me about a time you wrote the scope of work for a wind project service, such as a site survey, environmental study or engineering design.

  7. Question 7: Tell me about a time you managed site assessments or environmental studies, such as wildlife surveys or wind measurement, for a wind project.

  8. Question 8: Tell me about a permit application you prepared or helped prepare for a wind project, from gathering the studies to the agency's decision.

  9. Question 9: How do you keep a wind project's schedule, cost estimates, forecasts, and budget up to date when turbine delivery dates shift?

  10. Question 10: What do you look for when comparing bids for a wind farm's turbine installation contract?

  11. Question 11: Tell me about a time you prepared a request for proposals for wind project construction or for turbines and other equipment.

  12. Question 12: How do you review civil and engineering documents for a wind project to make sure they meet the codes, standards and regulations that apply?

  13. Question 13: Why do wind project teams, subcontractors and owners need regular project status reports?

  14. Question 14: Describe the documentation you have prepared for a wind project, such as site layouts, diagrams or permit exhibits.

  15. Question 15: Tell me about a time you gave technical support during the design, construction or commissioning of a wind farm.

  16. Question 16: Describe a time you resolved a disagreement between wind resource and engineering teams over a proposed turbine layout.

  17. Question 17: What is the difference between committed costs and actual costs when tracking a wind project budget?

  18. Question 18: What would you do if a proposed wind project agreement promised an operating date the project team could not support?

  19. Question 19: Give an example of how you caught overlapping demands for crews or equipment while checking a wind project plan.

  20. Question 20: Tell me about a time you worked with a wind project subcontractor to agree on acceptance checks before fieldwork began.