Wastewater Process Engineer Interview Questions

For engineers designing water supply and wastewater systems. Interviews focus on evaluating treatment plant designs and planning pumps, pipelines and sewers.

28 questions, ranked by what the job needs most

Print the top 10:Scoring sheetPractice sheet

  1. Question 1: Tell me about a part of a water or wastewater treatment plant you helped design.

  2. Question 2: When you review a proposed water or wastewater treatment design, how do you spot issues the design team needs to fix?

  3. Question 3: Share an example of how you designed a sewer or pump station to handle flows in a wastewater collection system.

  4. Question 4: Describe a water distribution project where you designed the pipe layout for an area or facility.

  5. Question 5: How do you design or select wastewater treatment equipment so the plant can meet its discharge limits?

  6. Question 6: Share an example of a time you used operating and maintenance records to improve a water or wastewater system's efficiency.

  7. Question 7: Tell me about a time you gave a junior engineer or drafting technician technical direction on a water or wastewater design.

  8. Question 8: What would you do if a wastewater lift station design had no way to prevent an overflow during a power outage?

  9. Question 9: How do you decide which wastewater treatment process to recommend for a water reuse project?

  10. Question 10: What do you check in a feasibility study before recommending that a water or wastewater facility move into design?

  11. Question 11: Walk me through how you would perform hydraulic analyses of water supply systems or water distribution networks to model flow characteristics, test for pressure losses, or to identify opportunities to mitigate risks and improve operational efficiency.

  12. Question 12: What do you consider first when sizing and siting a water storage tank for a distribution system?

  13. Question 13: Describe a water quality study in which you traced a pollutant back to its source.

  14. Question 14: Tell me about a time unusual water use data complicated your demand forecast.

  15. Question 15: Tell me about the last time when you conducted cost-benefit analyses for the construction of water supply systems, run-off collection networks, water and wastewater treatment plants, or wastewater collection systems.

  16. Question 16: Walk me through how you approach the design of a sludge treatment facility, from sludge characteristics to the final disposal route.

  17. Question 17: Walk me through a time you compared sludge disposal options with different hauling costs or acceptance requirements.

  18. Question 18: What is the most challenging part of overseeing the construction of decentralized or on-site wastewater treatment systems, including reclaimed water facilities?

  19. Question 19: Tell me about the last time you wrote technical reports or publications related to water resources development or water use efficiency.

  20. Question 20: Describe an experience when you provided technical support on water resource or treatment issues to government agencies.

  21. Question 21: Walk me through a water supply network or runoff collection system you designed and the constraints that shaped its layout.

  22. Question 22: What is the most challenging part of identifying design alternatives for the development of new water resources?

  23. Question 23: What kind of experience do you have developing plans for new water resources or water efficiency programs?

  24. Question 24: Explain to me how you would conduct environmental impact studies related to water and wastewater collection, treatment, or distribution.

  25. Question 25: Tell me about a time you analyzed a storm water or floodplain drainage system to fix erosion or an unstable stream bank.

  26. Question 26: Describe how you have used three-dimensional simulation software to model water movement or forecast the spread of a pollutant in a water supply.

  27. Question 27: How do you analyze the efficiency of water delivery structures such as canals, pipes, gates or penstocks?

  28. Question 28: Share your effective methods when performing mathematical modeling of underground or surface water resources, such as floodplains, ocean coastlines, streams, rivers, or wetlands.